Construction sector
Fleet management for construction
In construction, a vehicle off the road for a day is not a delay — it is an entire crew stuck on site.
Three constraints specific to construction
Off the road means work stopped
A van out of service stops the crew that depends on it.
Fleets spread across sites
Vehicles move to a different site every week.
Faster wear off-road
Preventive servicing has to follow real mileage.
What MoveX brings to it
Alerts before the vehicle is grounded
Roadworthiness tests, equipment checks and services flagged at 30/15/7 days.
Assignment by site
Every vehicle tied to a driver and a site, with full history.
Mileage-based plans
Work orders triggered by how the vehicle is actually used.
Case study
« We stopped finding out about deadlines after they had passed. »
Marc Théron — Logistics director, Batigreen, 62 vehicles
Read the case study →